FICO Eataly World
industriale
About the project
Cefla designed and developed the special and basic systems for FICO Eataly World. A turnkey solution, from the project to the maintenance of the entire structure of the new agri-food park in Bologna. Cefla constructed the mechanical systems for air conditioning, water-sanitation and technical water for industrial use; the electrical systems for power and lighting; and the special safety systems. The systems have an electric capacity of 6000 kWe, a thermal capacity of 6000 kWt and a cooling capacity of 6000 kWf. Work began in the spring of 2015 and concluded at the end of October 2017. Cefla Engineering was also appointed to oversee the maintenance of the structure, which aims to welcome an estimated six million visitors a year. FICO Eataly World is distinctive for being a shopping centre that contains 40 little agricultural producers and miniature industrial sites, each of which has requested special attention and the customisation of their systems.
TECHNICAL INFORMATION
Electrical Power: 6.000 kWe
Thermical Power: 6.000 kWt
Cooling Power: 6.000 kWf
Service: maintenance of the entire structure